top of page

POWER PERFORMANCE MEASUREMENTS

 

The Wind Turbine Power Performance Test aims to the establishment of the relation between the net electrical power delivered to the grid by a single wind turbine and the reference wind speed at a suitable upstream location. A power performance test aims either to experimentally prove the theoretically derived power curve of a new wind turbine model for certification purposes or to assess the warranty power curve of wind turbine units in a wind farm.

The test applies the IEC-61400-12 standard. The test often is a two- stage process. First, a site calibration is performed, i.e. a measurement procedure aiming to the establishment of the relation between the wind speed measured at the reference meteorological mast and that on a temporary mast deployed at the tested wind turbine position (prior to its erection). In case this is no possible, AEOLIKI Ltd offers alternative solutions (e.g. nacelle anemometry).

The second stage of the measurements (power curve) follows the completion of site calibration. Wind speed and direction, temperature, pressure, humidity, precipitation are measured on the reference meteorological tower. The active power delivered to the grid is measured with voltage (if necessary) and current transformers and a power transducer calibrated for a range of –50% to +200% of the wind turbine nominal power. Additional wind turbine operational parameters are provided from the sensor panel of the wind turbine using optical isolators as interfaces.

The data logging systems offer remote control, programming and data download through GSM modem . A comprehensive test report is issued according to IEC 61400-12 standard. Sensitivity analysis of power performance on selected parameters may be conducted according to the customer’s requirements. 

WHAT'S UP?

RECENT COMPLETED PROJECTS

 

Environmental Social Impact Assessment Study : EASTMED Pipeline Project - IGI Cyprus

Strategic Environmental Assessment (SEA) - Sustainable Urban Mobility Plans - Nicosia & Pafos

Strategic Environmental Assessment (SEA) and Monitoring Programme - Marine Master Plan

 

LAST EVENT

CURRENT ONGOING PROJECTS

 

Interdisciplinary HSE Studies and Services - ENI Cyprus

Circular Economy and Defence Sector Sustainability through Eco-Management and Audit Scheme implementation (CEDSEMAS)

​Strategic Environmental Assessment (SEA) - National Energy and Climate Plan

Sustainable Energy Capabilities for Enhanced Military Camps and Operations (SENTINEL) Project

CONTACT

41 Themistokli Dervi Str.

Tel. +357 22 875707

Fax: +357 22 757778

Email: info@aeoliki.com

  • w-facebook
  • Twitter Clean

© 2023 BY FREE LINE CREATIVE STUDIO. PROUDLY CREATED WITH WIX.COM

bottom of page