MSW MANAGEMENT

  • Compilation and normalization data-building scenarios – INTEREG MED Blueislands, (October 2018 – January 2019);

  • Pafos Municipality Waste Oprimisation Study, Pafos Municipality Pafos, (2018 – 2019)

  • Study on the implementation of rational waste management in the public sector, Funded by Ministry of Environment, Agriculture and Rural Development, Cyprus, 2017;  

  • Study on the development of re-use centres and networks in Cyprus, as currently promoted by Article 11 of the existing Waste Framework Directive, Funded by Ministry of Environment, Agriculture and Rural Development, Cyprus, 2017;  

  • Study on the reduction and recovery of biodegradable waste, Funded by Ministry of Environment, Agriculture and Rural Development, Cyprus, 2017;  

  • Preparation of a comprehensive feasibility study (“FS”) to determine a priority investment programme (the “PIP”) of a hazardous waste management project in Georgia and evaluate its benefits prior to the Bank making its financing decision, Funded by EBRD, 2017 – 2018;

  • Mid-Term Evaluation of EU 10th EDF Pacific Hazardous Waste Management Programme, FEC BENEFECIARIES 2013 – LOT 6: Environment, Europe Aid/132633/C/SER/multi, Funded by European Commission, 2017;

  • End of waste criteria for the production and use of pyrolysis fuel oil from used tyres, 2017;

  • National Program for the reduction of the municipal solid waste of Larnaca, Agia Napa and Paralimni Municipalities : Feasibility study, Technoeconomic study, Cost Benefit analysis study, and Financing study, Funded by Ministry of Environment, Agriculture and Rural Development, Cyprus, 2017 – 2018;  

  • National Program for the reduction of the municipal solid waste of Limassol, Pafos, Germasogia,Geroskipou, Polis Chrisochous, Pegia Municipalities, and Agios Tichonas, Pirgos, Pareklisia, Moutagiaka, and Neo Chorio Local Authorities: Feasibility study, Technoeconomic study, Cost Benefit analysis study, and Financing study, Funded by Ministry of Environment, Agriculture and Rural Development, Cyprus, 2016;  

  • Hazardous Waste Management Plan of National Guard Cyprus, Funded by Ministry Defence, Cyprus, 2016; 

  • Preparation and implementation of the Waste Management plan of the project:   “Restoration of the Holy Monastery of Apostolos  Andreas – Phase I”,  Funded by UNDP (2014-2016);

  • Asbestos Refurbishment and Demolition Survey and Waste Management Plan of Electricity Authority of Cyprus Moni Power Station, Funded by Electricity Authority of Cyprus, 2016;

  • Preparation and Implementation of a Waste Management Plan: Execution of onshore and offshore geotechnical investigations, marine bathymetric and geophysics survey for the baseline geotechnical assessment of an LNG facility in Vasilikos, Cyprus, Funded by NOBLE Energy Inc. Ltd., 2015 – 2016;

  • Development of an ‘Environmental, Legislative, Permits and Consent Plan’ for NOBLE’s offshore and onshore Cyprus development activities: Hazardous waste storage and management activities, Funded by NOBLE Energy, 2015;

  • Preparation and Implementation of the Hazardous Waste Management Plan: Demolition and rehabilitation works at Mitsero mining plant, Funded by HELLENING MINING PUBLIC COMPANY, 2013;

  • Design, Environmental Impact Assessment Study, Energy Study and Feasibility Study for the construction works and operation of a 2 MW solid waste gasification plant at Pafos area, Funded by NOBLE Energy Inc. Ltd., 2013 – 2014;

  • Development and implementation of a Waste Management Plan for the asbestos removal and disposal at abandoned Asbestos Mine at Troodos, of the Old Terminal of Larnaca Airport, Larnaca Cyprus, Funded by HERMES AIRPORTS Ltd., 2010

HAZARDOUS WASTE PROJECTS

Environmental Social Impact Assessment Study: Cement Kiln Dust disposal facility site, Vassilikos Cement Works Public Company, 2020;

Environmental Compliance Audit, Skouriotissa Copper and Gold Mine, HCM, 2019;

Environmental Social Impact Assessment for the two new Integrated Hazardous Waste Management Facilities at Rustavi Industrial Area and Kutaisi Industrial Area in Georgia, European Bank Restructuring and Development, (February 2019 – December 2019);

Integrated Hazardous Waste Management Facility at Rustavi, Republic of Georgia: Environmental Accident Risk Assessment  (2018 – 2019);

Rustavi “Solid Waste Management Company Georgia” Hazardous Waste landfill: Environmental Risk Assessment (2018 – 2019);

Integrated Hazardous Waste Management Facility at Nakhshirghele site, Republic of Georgia: Environmental Accident Risk Assessment  (2018 – 2019);

Environmental Risk Assessment of candidate sites for Eastern Georgia Hazardous Waste management facilities: Iaghluja Former Military Base and Iaghluja gypsum  quarry (2018);

Environmental Risk Assessment of candidate sites for Western Georgia Hazardous Waste management facilities: Argveta site and Ajameti site (2018);

Environmental Social Impact Assessment for the construction and operation of 400,000 tn/annum waste plasma gasifier and 52MW power station in Cyprus, International Investment Fund (2018);

Environmental Risk Assessment for the EAC VASSILIKOS POWER STATION new Environmental Projects (Boiler 1 and 2 Flue gas Desulphurization Systems, Boiler 3 Seawater Flue gas Desulphurization System, Boiler 1,2 and 3 Selective Catalytic Reactor Systems, new Combined Cycle Power Generation Unit 160 MW), EAC  (2018);

Environmental Risk Assessment for the construction and operation of 400,000 tn/annum waste plasma gasifier and 52MW power station in Cyprus, (2018);

Cyanide accident atmospheric release study (Environmental Accident Risk Assessment):  Hellenic Copper Mines GOLD REFINERY at Skouriotissa, Cyprus (2018);

Environmental Social Impact Assessment for the demolition and site rehabilitation of PETROLINA Tank T-3004 storage farm at Larnaca, PETROLINA, (2017);

Environmental Risk Assessment and Environmental Compliance Audit: Industrial Chemical Facility, Larissa, Greece (2017);

Environmental Risk Assessment for the construction and operation of the new Fuel Farm of KODAP at Vassilikos Industrial Zone (2016-2017);

Preparatory study for EU intervention to support Sustainable Management of Persistent Organic Pollutants (POPs) in Egypt”, Framework Contract Beneficiaries, Lot 6 – Environment, Specific Contract No. 2015/367359, EU Delegation in Egypt (2015 – 2016);

Environmental Risk Assessment and Environmental Compliance Audit: Halliburton Hydrocarbon Exploration Supporting Facilities (2015);

Environmental Risk Assessment and Environmental Compliance Audit: Chloro-Alkali Industrial Plant, Thessaloniki, Greece (2016);

Accident chlorine atmospheric release study (Environmental Accident Risk Assessment) for the construction and operation of a GOLD REFINERY plant at Arhadippou Larnaca Industrial Zone(2016);

Environmental Risk Assessment and Environmental Compliance Audit: Vasilikos Fuel Storage Facilities, (2015);

Stack emissions sampling, analysis and environmental risk assessment at Mitsero Mine Calciner plant, Hellenic Mines Public Company, (2015);

Noble Energy – Cyprus Onshore LNG Project: Environmental Site Assessment Phase I and II in collaboration with ERM Italy S.A (2014-2015);

Noble Energy – Cyprus Onshore LNG Project: Environmental Risk Assessment Study, in collaboration with ERM Italy S.A (2014-2016);

Limited Environmental, Health & Safety Compliance Assessment: Onshore Base Hydrocarbon exploration supporting facilities at Aradhippou Industrial Area. Contract with ERM Italy, (2015)

Environmental, Health, Safety and Social (EHSS) Assessment: Onshore Petroleum Products Terminal at Vasilikos Industrial Area . Contract with ERM Italy (2015);

Environmental Risk Assessment Study : Rockwool (Insulation Material) waste at Vasilikos Power Station, Cyprus (2014);

Environmental Risk Assessment Study: Waste Tyre Recycling and Used Oils Biodiesel plant at Tseri Cyprus (2014);

Environmental Risk Assessment Study: demolition and rehabilitation works at Moni EAC Power Station plant (2014);

Asbestos emissions sampling, analysis and environmental risk assessment: Demolition and rehabilitation works at Moni EAC Power Station plant, ELECTRICITY AUTHORITY of CYPRUS (2014);

Environmental Social Impact Assessment Study for the disposal of Rockwool (Insulation Material) waste at Vasilikos Power Station, Cyprus.  Funded by ELECTRICITY AUTHORITY of CYPRUS Ltd. Duration 2 months (2014);

Environmental Social Impact Assessment Study for the construction and operation of a Waste Tyre Recycling and Used Oils Biodiesel plant at Tseri Cyprus. Funded by FALCON ELECTRICITY Ltd. Duration 9 months (2014);

Environmental Social Impact Assessment Study for the demolition and rehabilitation works at Moni EAC Power Station plant. Funded by ELECTRICITY AUTHORITY of CYPRUS. Duration 6 months (2014);

Implementation and Monitoring of Waste Management Program during A1 and A2 Exploration activities of Block 12 Offshore Cyprus. Contract with NOBLE ENERGY Inc. (2010-2014);

Implementation and Monitoring of Waste Management Program during A1 and A2 Exploration activities of Block 12 Offshore Cyprus. Contract with NOBLE ENERGY Inc. (2010-2014);

Environmental Impact Assessment Study for the construction works and operation of a                   1500 tons/year used tyres pyrolysis  plant at Pyrga Limassol area. Funded by FALCON Ltd. Duration   3 months (2013),

Environmental  Impact Assessment Study for the construction works and operation of the onshore and offshore installations and pipelines for the receipt of Crude Natural Gas. Funded by the Israeli Government. Duration 12 months (2011)

Development and Implementation of the Environmental, Monitoring and Audit Programme for the Exploration Drilling A1 at Block 12, Offshore Cyprus, Contract with NOBLE ENERGY Inc. (2010-2011);

Development of an Environmental, Health and Safety (EHS) Risk and Regulatory Register for NOBLE’s on‐going and potential future activities in Cyprus (2011);

Asbestos emissions sampling, analysis and environmental risk assessment: Demolition and rehabilitation works at Old Terminal of Larnaca International Airport (2011);

Environmental Impact Assessment Study of the Mud Plant at Limassol Port Area, (2011);

Onshore Base Hydrocarbon Waste facilities: Environmental, Health Safety and Security Risk Assessment – Exploration Drilling Activities ENI”. Gulf Agency Company Cyprus (GAC)  Ltd. (2009);

 Development of an Environmental, Health and Safety (EHS) Risk and Regulatory Register for NOBLE’s on‐going and potential future activities in Cyprus. Contract with ACORN Inc. (2011);

Oil drilling mud process facility: Environmental, Health Safety Risk Assessment. IESC Ltd., (2009);

Environmental Impact Assessment Study for the construction works and operation of the Cyprus Energy Centre at Vasiliko. Contract with the Ministry of Commerce, Industry and Tourism. Duration 8 months (2005 - 2006);

Asbestos emissions sampling, analysis and environmental risk assessment: asbestos removal of the Old Fire Station Building at Pafos Airport, Cyprus (2009 – 2010);

Environmental Risk Assessment and Environmental Compliance Audit : Fuel Storage Facilities of Larnaka International Airport (2008);

Environmental Risk Appraisal and Environmental Compliance Audit : Cyprus Energy Centre at Vasiliko (2005 - 2006);

 Environmental Risk  Assessment Study for Vassilikos Floating LNG Power Station (2004 - 2005)